Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
WoW Tiling will use all the correct materials for the job including but not limited to.
Sub floor preparation:
Latex
cement board
Decoupling membrane
Floor grinding may be required to accept tiling and ensure longevity of the workmanship.
Wall Preparation
Walls should be free of wallpaper and paint
Wall primer must be used on all walls that will be tiled.
Tanking membrane should be applied to wet areas (showers)
Welcome! Book a free site survey today